News

41% Year‑on‑Year Surge! China Adds 27.1 GWh of New Storage Capacity in Q1, with Independent Storage Taking the Lead

2026-06-16

According to the China Energy Storage Alliance (CNESA), newly operational power‑storage projects in the first quarter reached 10.9 GW, a year‑on‑year increase of 41%. New‑type storage (excluding conventional pumped hydro) accounted for nearly all new installations, with power capacity growing 60% and energy capacity 76% year‑on‑year.

The data reveal a clear structural shift in China’s storage market. Independent storage projects dominated new additions, while both renewable‑paired storage and behind‑the‑meter storage declined.

On the grid‑side and generation‑side, new‑type storage added in Q1 totalled 9.9 GW / 25.8 GWh – a power‑capacity increase of 82% and an energy‑capacity increase of 100% compared with the same period last year, representing 95% of total new power capacity in the quarter.


Independent Storage Becomes the Main Driver

CNESA recorded 8.7 GW / 23.0 GWh of newly operational independent storage projects, with power capacity up 174% and energy capacity up 205% year‑on‑year. Independent storage accounted for 83% of new power capacity, a 34‑percentage‑point rise from the same period in 2025.

By contrast, newly operational storage paired with renewable projects fell to 1.0 GW / 2.5 GWh – a 56% drop in power capacity and 54% drop in energy capacity – and its share of new power capacity shrank by 23 percentage points compared with Q1 2025.

Behind‑the‑meter storage also weakened. New behind‑the‑meter installations in Q1 reached 545 MW / 1,252 MWh, down 50% in power and 49% in energy. CNESA attributed the decline to narrowing peak‑to‑valley tariff spreads, lower project returns, the cancellation of fixed time‑of‑use tariffs in some regions, and the phase‑out of local subsidy policies.

Commercial & industrial (C&I) storage accounted for 96% of behind‑the‑meter power capacity. Jiangsu, Sichuan, Guangdong, Anhui, and Shandong were the main markets, with the top five provinces together accounting for 93% of new behind‑the‑meter capacity. Jiangsu alone contributed more than half of the nation’s new behind‑the‑meter power additions.


Regional Highlights

New‑type storage projects were commissioned across 30 provinces, autonomous regions, and municipalities. Northwest China accounted for 55% of the nation’s new energy capacity. Xinjiang led all regions with over 5 GWh of new installations, and seven provincial‑level areas – including Xinjiang, Ningxia, Jiangsu, Shandong, and Inner Mongolia – each added more than 1 GWh.

The project pipeline also expanded. CNESA recorded 2,919 newly filed new‑type storage projects in Q1, totalling about 677 GWh. While the number of filings fell 9% year‑on‑year, total energy capacity rose 199%, indicating a clear shift toward larger, more centralised projects in China’s storage pipeline.


Source: CNESA, Global Energy Storage Network, New Energy Network (compilation)


Contact Us
  • Address: No. 121, Haixiu Road, Longhua District, Haikou City, Hainan, China
    Room 706, 7th Floor, Building 2, No. 1018 Mingzhu Road, Xujing Town, Qingpu District, Shanghai, China
  • Email: bd@voltrix.energy
Message
We will respond as soon as possible
© 2026 Voltrix New Energy Technology Co., Ltd. (Voltrix)  All Rights Reserved. Powered By Tengyun